| Schemes Constructed
by IRD (Sharaid Foot Suspension Bridge) |
The main problem was the communication between Sharaid and surrounding
villages on the other side of the river. There used ti be a
traditional wooden cantilever bridge, which link Shariad with
other villages, but during the devastating 1992 flood, this
bridge swept away .The community used to construct the temporary
wooden bridge each year and the community feel a dire need to
construct permanent bridge.
The bridge constructed by PCDP links Sharaid , Kuz Seer ,Bar
Seer and the other surrounding villages .The total direct beneficiaries
are 963 and there will be indirect beneficiaries will use occasionally
use the bridge. The villagers have about 1099 Livestock and
they are using the bridge for crossing the river. |
| Kuz Paro Water
Mill/River Protection Spur |
| Kuz Paro is
first village along the main Bar Palas foot track .It is accessed
by Pattan to Ziarat road about 26 Km (Up to Sharial Nallah)
and beyond it three km on foot track .There were 8 water mills
before the 1992 flood ,facilitating the maize grain grinding
for the surrounding villages that includes Kuzparo,Barparo,Mughal
Abad and Kalyar.
The Community based Organization formed with the aim of Biodiversity
Conservation in Feb, 2002, with the Motivation of PCDP staff.
As the CBO formed, they repeatedly requested for construction
of Water mills and river protection spur. Site is located
near to the high flood level but there was no other communal
land .Keeping in mind the risk involved and repeated request
of Kuz and Bar Paro CBOs , 400 feet long channel and a protection
spur [Gabion Materials] (2700 cft) was constructed at the
site.
The Contribution for the mill from all the surrounding villages
is the indicator of common interest. PCDP constructed River
Protection Spur and water channel but the water mill is still
under construction
|
| Kundal Irrigation
Channel |
Kundal is one of
the remotest hamlet of Bar Palas and Situated about 46 Km from
Pattan (According to the statement of Local People). The Kundal
is accessed by road up to Sharial nallah, which is 26 Km from
Pattan and beyond it, is accessed by feet.
There are 873 persons living in 113 Households. The People have
dependency on Agriculture, Live Stock and the other natural
Resources. The People are poor and mostly work as an unskilled
Laborer in other Parts of the Country.
The Community of Kundal, organized in a CBO by the Motivation
of PCDP in Nov.2001.
The CBO requested the Project through a resolution to help them
in the development of irrigation Channel. The Channel was closed
somewhere 50 years back. Some of the village Influential develops
another channel but they were not allowing the other people
to irrigate their lands. The Construction of the Channel will
facilitate the work of all the People. The total length of channel
is 5238 feet (1.6 Km). The nature of Channel is unlined but
includes aqueduct, dry stone rubble masonry, as well as blasting
of rock at the required points. The channel is benefiting 50%
population of Kundal village.
|
| Gulbagh Irrigation
Channel |
The channel was
previously constructed by the community but the flood has washed
away the channel as well as the channel is passing through sliding
area. The CBO Requested to help them and providing pipeline
for the specific sliding area. THE PCDP provided 560 feet long
pipe and constructed intake as well as retaining wall.  |
| Harran Irrigation
Channel |
Haran, the 3rd
village after Seer Ghazi abad on the Pattan –Sharakot
Road in Kuz Palas Valley. Total inhabitants in the village are
3025 living in 275 households [According to the COP office file
Record].
The villager organized in the shape of the Community based Organization
(CBO) with the aim to conserve the natural resources and Biodiversity
Conservation of Palas valley in May 2001. The CBO through a
resolution, asked for improvement of the irrigation channel.
The Haran has cultivatable land of 100 Jribs irrigated by two
channels. The Channel damaged in the flood and rehabilitated
in Khushal Pakistan Program but it again damaged. The CBO through
a resolution, asked for improvement of the irrigation channel.
The works PCDP did include 600 cft Structure Excavation in Hard
Rock Materials, Intake structure and 500 feet Pipe Channel.
 |
| River Protection
Spur Gaddar |
On main track in
bar Palas near Gaddar, the River Mushagah directly hit the track
and the people in summer, when the water level in the river
was high enough could not use the path and was dangerous if
used. The PCDP Constructed the Protection Spur to make the track
comfortable and useable through out the year. It is facilitating
the entire population of Bar Palas. |
| Rest Huts |
| Two Rest hut Huts
constructed in Dassu and Pattan. |
| Up gradation
of foot track |
10 km from Paro
to Sharaid {5km point blasting and 5km and 5km point blasting)
10 km Shraid to kundal upgraded
1km from Maidan to sharial upgraded
The track main achievement is the shifting of load form the
heads and shoulders of men and women of bar palas to the donkeys. |
| Material Store
at Pattan |
| A store for stacking
of materials constructed at pattan |
| Schemes Under
Construction |
1. Suspension Foot
Bridge Bngaha Bar Palas
This is located on main track and will facilitated the entire
community of bar Palas
2. Suspension Foot Bridge pherorgah Bar Palas
This is located on main track and will facilitated the entire
community of bar Palas
3. Irrigation Water Channel Scheme Shalkan Abad Kuz Palas Conservation
and Development Project
The earthen channel requested to upgrade through lining but
it is taking too much time although the length of channel is
1500 feet.
4. Irrigation Water Channel Scheme Bar Gabeer Kuz Palas
It is linking one channel with other to increase the discharge
of the existing channel and will irrigate more land.
5. Water Supply Scheme Tawheed Abad Kuz Palas
6. Water Supply Scheme Karo Seer Bar Palas
7. Field Rest hut Hut at Dado Banda Gaddar Bar Palas
|
| Schemes Planned
|
| 1. Suspension
Foot Bridge Gaddar Bar Palas
2. Suspension Foot Bridge Nou Bar Palas
3. Suspension Foot Bridge Shambaila Bar Palas
4. Suspension Foot Bridge Maidan Bar Sharial Kuz Palas
5. Irrigation Water Channel Scheme Kuz Seer
6. River Protection Spur Peach Bella Bar Palas
7. River Protection Spur Hisar Bar Palas
8. River Protection Spur Dum Bella Bar Palas
9. River Protection Spur Wool Bella Bar Palas
10. Field Rest hut Kundal Bar Palas
11. PCDP HQ at Seer Ghazi Abad Palas
|