| To assess
the impacts of rehabilitation of small infrastructures, the
PCDP have plan to conduct detailed EIA, altough we have conducted
for small hydro power schemes as a part of feasibility report.
IRD contributions to Biodiversity Conservation are:
| Concept |
Activities |
Process |
Biodiversity |
| Infrastructure
Development Through Community Participation |
Suspension Foot Bridge
Bridal Path
Water Mills Water Channel. Protection Spur. Hydro
Power Schemes
Water Supply |
Identification by CBO·
Social feasibility· Technical Feasibility·
Survey, Design and Estimate· TOP· Approval
of TOP· Participatory implementation· O&
M· Follow Up |
1:· Reduces timber
uses· Even distribution of grazing· Trade
of
2:· Trade of· Saving tim
3:· Saving time· Permanent Settlement
4&5:· Trade off · Increase green
Coverage/fodder· Erosion Control· Trade
off· Poverty Reduction |

|