| |
Reports
> Consultants Reports |
|
| Consultants
Reports |
|
Study
existing use regime of key floral species, identify
issues and threats
Consultancy # 5, Final Report
Click
on the cover page to download report. 2.69Mb pdf
______________________
|
|
Initiate
Five Year
Ethnobotanical Research outline Workplan
Consultancy # 6, Midterm Report
Click
on the cover page to download report. 0.98Mb pdf
______________________
|
|
Design
Messages and Action that Link Conservation and Development
Consultancy
# 7, Final Report
Click
on the cover page to download report. 257kb pdf
______________________
|
|
Environmental
Awareness & Training Programme
Consultancy
# 7a, Final Report
Click
on the cover page to download report. 565kb pdf
______________________
|
|
Geographic
Information Systems Strategy for PCDP
Consultancy
# 8a, Final Report
Click
on the cover page to download report. 477kb pdf
______________________
|
|
A
GIS Data Dictionary for PCDP
Consultancy
# 8b, Final Report, Part 1
Click
on the cover page to download report. 770kb pdf
______________________
|
|
A
GIS Data Dictionary for PCDP
Consultancy
# 8b, Final Report, Part 2
Click
on the cover page to download report. 800kb pdf
______________________
|
|
GIS
Landcover Mapping for PCDP
Consultancy
# 8c, Final Report
Click
on the cover page to download report. 2.75Mb pdf
______________________
|
|
GIS
Landcover Mapping for PCDP
Consultancy
# 8c, Final Report, Part 1 of
3
Click
on the cover page to download report. 1.25Mb pdf
______________________
|
|
GIS
Landcover Mapping for PCDP
Consultancy
# 8c, Final Report, Part 2 of
3
Click
on the cover page to download report. 1.2Mb pdf
______________________
|
|
GIS
Landcover Mapping for PCDP
Consultancy # 8c, Final Report,
Part 3 of 3
Click
on the cover page to download report. 318kb pdf
______________________
|
|
Potential
Habitat Mapping for Key Species of the Palas Valley
GIS
based Potential Habitat Modeling Consultancy # 8d,
Final Report
Click
on the cover page to download report. 1.65Mb pdf
______________________
|
|
Review
of Approaches to Species Conservation in Pakistan
Consultancy
# 9 Final Report
Click
on the cover page to download report. 645kb pdf
______________________
|
|
Species
Recovery Plan and Scientific Research Studies
Consultancy
# 11, Final Report
Click
on the cover page to download report. 1.74Mb pdf
______________________
|
|
Prospects
and implications of promoting Palas Valley, Kohistan
as a UNESCO World Heritage Site/Man and Biosphere
Reserve
Consultancy
# 12, Final Report
Click
on the cover page to download report. 519Kb pdf
______________________
|
|
Document
the proposed enhancement of earnings of non timber
forests products
Consultancy
# 15, Final Report
Click
on the cover page to download report. 113kb pdf
______________________
|
|
“Identify
the Measures for Sustainable Agriculture Based on
Improved Variety and Crop Rotation Without Affecting
the NRM Components”
Consultancy # 16, Final Report
Click
on the cover page to download report. 121Mb pdf (APPENDICES
719Kb Word file)
|
|
Design
an action plan for livestock keeping and management
practices in two pastures
Consultancy # 17, Final Report
Click
on the cover page to download report. 932kb pdf
|
|
Zonificationfor
the Valley Catchments of Bar Palas with Zone Specific
Management Precriptions
Consultancy
# 18, Final Report
Click
on the cover page to download report. 2.13Mb pdf
______________________
|
|
DESIGN
PLAN FOR KITCHEN GARDENING AND BACKYARD POULTRY FARMING
Consultancy
# 21, Final Report
Click
on the cover page to download report. 2.13Mb pdf
______________________
|
|
GUIDE
BOOK For Mechanism for Improved Forest Management,
Reduction in Timber Conversion Waste and Increase
the Timber Outturn Percentage.
Consultancy
# 22, Final Report
Click
on the cover page to download report. 2.13Mb pdf
______________________
|
|
GUIDE
BOOK FOR PLANNING TIMBER HARVESTING SYSTEMS
Click
on the cover page to download report. 2.13Mb pdf
______________________
|
|
Ecotourism
Potential In Palas Valley
Consultancy
# 28, Final Report
Click
on the cover page to download report. 2.13Mb pdf
______________________
|
|
Consultancy
# 30, Final Presentation
Click
on the cover page to download report. 3.4Mb pdf
______________________
|
|
A
Literature Review of the Impacts of Logging on Wildlife
in Mountain Areas
Consultancy
# 31, Final Report
Click
on the cover page to download report. 872kb pdf
______________________
|
|
An
Updated Review of Logging Practices in the Valley
(following Lifting of Ban in December 2001),
Likely Outcomes and Discussions of Actions
that should be taken by the Project
Consultancy # 32, Final Report
Click
on the cover page to download report. 1.46Mb pdf
|
|
To
Develop, Demonstrate and Transfer Integrated Pest
and Disease Management Technologies for Fruit Trees
and Crops in Palas Valley
Consultancy # 35, Final Report
Click
on the cover page to download report. 1.42Mb pdf
|
|
Suggest
Means to Improve Nutrition and Reduce Dietary Deficiencies
with Special Focus on Women and Children
Consultancy # 38, Final Report
Click
on the cover page to download report. 1.03Mb pdf
|
|
Support
to the preparation of the draft revised working plan
for Palas forests
Consultancy # 42, Final Report
Click
on the cover page to download report. 1.03Mb pdf
|
|
PREPARATION
OF VARIOUS REPORTS IN URDU
Consultancy # 47, Final Report
Click
on the cover page to download report. 1.03Mb pdf
|
|
LONG
TERM SUPPORT TO BIODIVERSITY CONSERVATION SECTOR IN
PALAS CONSERVATION AND DEVELOPMENT PROJECT INDUS KOHISTAN,
NWFP
Consultancy # 48, Final Report
Click
on the cover page to download report. 1.03Mb pdf
|
|
Habitat
Mapping in the Selected Areas of the Palas Valley
using High-resolution Satellite Data
Consultancy # 50a, Final Report
Click
on the cover page to download report. 1.99Mb pdf
|
|
Establishment
of Fauna Distribution Information System for the Palas
Valley
Consultancy # 50b, Final Report
Click
on the cover page to download report. 1.99Mb pdf
|
|
BISP
(Botanical Information System of Palas)
Development of Ethno-botanical Database of Palas Valley
Consultancy # 50c, Final Report
Click
on the cover page to download report. 3.68Mb pdf
|
|
Establishment
of Fauna Distribution Information System for the Palas
Valley
Consultancy # 53, Final Report
Click
on the cover page to download report. 2.00Mb pdf
|
|
“Long
Term Support to Participatory Forest Management”
Consultancy #58, Final Report
Click
on the cover page to download report. 809Kb pdf
|
|
Feasibility
on the introduction of improved breeds of small and
large animals.
Consultancy # 65, Final Report
Click
on the cover page to download report. 0.97Mb pdf
|
|
Long-Term
Support to Project Management Unit of PCDP.
Consultancy # 75, Final Report
Click
on the cover page to download report. 0.97Mb pdf
|
|
IMPLEMENTATION
STRATEGY
Consultancy # 85, Final Report
Click
on the cover page to download report. 0.97Mb pdf
|
|
Are divergent
preferences
between benefactors and beneficiaries
an obstacle to community-based conservation?
A case study of the Palas Valley, northern Pakistan
Alexander Hellquist
Click
on the cover page to download report. 0.97Mb pdf
|
|
Training
of Para-Medical Students Referred by PCDP From June
15 2003 to June 14 2004
Consultancy # T-13, Final Report
Click
on the cover page to download report. 251Kb pdf
|
|
GIS
Training Workshops
Alpine Hotel, Abbottabad
6-10 October, 2003
3-6 November, 2004
Consultancy # T-20, Final Report
Click
on the cover page to download report. 251Kb pdf
|
|
Report
on the workshop on
Conservation of Biodiversity through Rural Development
10th to 13th November 2003, Peshawar
Consultancy # T-21, Final Report
Click
on the cover page to download report. 369Kb pdf
|
|
Conflict
Resolution Training Workshop
held in Abbotabad (5th– 7th May 2004)
Consultancy # T-25, Final Report
Click
on the cover page to download report. 246Kb pdf
|
|
Village
Vets Training (June 2004)
Consultancy # T-37, Final Report
Click
on the cover page to download report. 1.02Mb pdf
|
|

|
|
|